規(gui)格(ge)型號:40mm-200mm CFRP碳素(su)波(bo)紋管(guan)也就是通(tong)常所說的碳素(su)波(bo)紋管(guan)。CFRP碳(tan)素波紋(wen)管(guan)(guan)是(shi)以高(gao)密度(du)聚乙(yi)烯和改性(xing)碳(tan)素為(wei)主要(yao)原(yuan)料,碳(tan)素波紋(wen)管(guan)(guan)管(guan)(guan)采用擠出成(cheng)型(xing)(xing)和獨特的旋轉成(cheng)型(xing)(xing)工(gong)藝(yi)技(ji)術生產的新型(xing)(xing)電(dian)(dian)力(li)線纜(lan)保護管(guan)(guan)道(dao)。它以其特有的螺紋(wen)狀物造型(xing)(xing),碳(tan)素波紋(wen)管(guan)(guan)具有高(gao)強度(du)、高(gao)韌性(xing)耐腐蝕、耐高(gao)溫、絕緣電(dian)(dian)阻(zu)高(gao)、阻(zu)燃性(xing)好、質量輕、壽命長、不易變形等多種優點,該碳(tan)素波紋(wen)管(guan)(guan)已廣(guang)泛應(ying)用于(yu)城市路燈線路地(di)埋工(gong)程(cheng)(cheng)(cheng),電(dian)(dian)氣(qi)化(hua)鐵(tie)路電(dian)(dian)力(li)、通(tong)信(xin)電(dian)(dian)纜(lan)的敷設地(di)埋工(gong)程(cheng)(cheng)(cheng),高(gao)速公路電(dian)(dian)力(li)、通(tong)信(xin)設施的建設與改造工(gong)程(cheng)(cheng)(cheng),住宅小區建設工(gong)程(cheng)(cheng)(cheng)及公園和大型(xing)(xing)娛(yu)樂場所的地(di)埋電(dian)(dian)纜(lan)工(gong)程(cheng)(cheng)(cheng),是(shi)目前最理想(xiang)的地(di)埋電(dian)(dian)纜(lan)護套管(guan)(guan)材。
![]() |
![]() |
施工方法
一、地埋電纜護套管管徑的選(xuan)擇
根據電纜外徑、容許電壓、電流及工程其他(ta)條件(jian)選擇。
二、挖工程溝
根據(ju)有關部門規定(ding)用(yong)戶要求挖溝,其寬度(du)、深度(du)須根據(ju)敷(fu)設電纜根數而定(ding)。管與溝之間的距(ju)離是(shi)50mm,管(guan)(guan)與管(guan)(guan)之間的(de)距離為30mm。
三、鋪(pu)設
將(jiang)(jiang)地埋電纜護套(tao)管(guan)放入溝中后,彎度大的地方為(wei)防止(zhi)其纏繞或(huo)擠壓(ya),須用水(shui)泥灌封。在(zai)兩根護套(tao)管(guan)連(lian)接(jie)口處,須用磚砌并用水(shui)泥將(jiang)(jiang)護套(tao)管(guan)管(guan)頭固定(ding)。
四、對連
兩根地埋電纜護套管對接(jie)時,先將接(jie)頭(tou)旋至(zhi)(zhi)被(bei)接(jie)管的(de)一(yi)端,然后倒(dao)旋至(zhi)(zhi)另(ling)一(yi)被(bei)接(jie)管的(de)一(yi)端,再(zai)用PVC密(mi)封膠帶纏繞即可。
五、回填
按要求將地埋電纜護套鋪設好后,用挖地溝的原土回填即(ji)可,并將回填土夯實。
六、注意
鋪設過程中,須(xu)放(fang)置砂土進(jin)入地埋電(dian)纜護套管中。